Customer

Ahrtal-Werke

Construction site

Bad Neuenahr

Industry

Provider

Client

Ahrtal-Werke

Order value

12.000.000 €

Customer requirement

Construction of a new combined heat and power plant to generate heat for the district heating network in Bad Neuenahr, as well as generating electricity via 2 natural gas generators as a by-product.

Technical details
  • 2 Medium-voltage switchgear in primary and secondary versions
  • 2 transformers with 1.6 MW each Busbar mounting between transformer and NSAV
  • Delivery and installation NSAV 2,500 ampere
  • Supply and installation Auxiliary power supply, designed as 400VAC and 60VDC
  • Low-voltage sub-distribution board for the
  • Building installation
  • General building installation, lighting with safety function, expansion of cable support systems and cable routes